# Santa Rosa de Lima and Anitápolis, gravel

> Brazil. Best April to May; rideable all year but December, January and February.

Canonical page: https://www.outdoorgrid.ai/ride/santa-rosa-de-lima/gravel
Facts checked: 2026-11-14

## Santa Rosa de Lima and Anitápolis gravel

- Riding: Gravel, up by pedalling. (source: © OpenStreetMap contributors, checked 2026-11-14)
- Riding months: Best April to May; rideable all year but December, January and February. (source: Climate of the last ten complete years from the NASA Langley Research Center POWER Project (monthly API), funded through the NASA Earth Science Division. Rain and snow days are estimates from monthly precipitation., checked 2026-11-02)
- Trails: 784 km of trails mapped on OpenStreetMap. (source: © OpenStreetMap contributors, checked 2026-11-14)
- Access: Florianópolis (FLN), about 2 h 35 by car or transfer. (source: © OpenStreetMap contributors, checked 2026-10-29)

## At a glance

- Gravel: 784 km (100% unpaved)
- Airport to fly to: Florianópolis (FLN) (then 2 h 35 by car)

## When to go

Best April to May; rideable all year but December, January and February.

- Jan: Low season, start early on Cachoeira May or Rio Bravo and carry extra water. Summer storms turn the dirt roads to mud; wait a day after heavy rain
- Feb: Low season, start early on Cachoeira May or Rio Bravo and carry extra water. Summer storms turn the dirt roads to mud; wait a day after heavy rain
- Mar: Good
- Apr: At its best
- May: At its best
- Jun: Good
- Jul: Good
- Aug: Good
- Sep: Good
- Oct: Good
- Nov: Good
- Dec: Low season, start early on Cachoeira May or Rio Bravo and carry extra water. Summer storms turn the dirt roads to mud; wait a day after heavy rain

## Good to know

- Mostly off tarmac: 100% unpaved across 784 km of gravel
- Loops to follow: 4 loops checked by our team
- Close to an airport: Florianópolis (FLN), 2 h 35 by car

## Questions riders ask

### Where does the circuit start?

At the Igreja Matriz in Santa Rosa de Lima or the Praça Central in Anitápolis.

Sources: Climate of the last ten complete years from the NASA Langley Research Center POWER Project (monthly API), funded through the NASA Earth Science Division. Rain and snow days are estimates from monthly precipitation.; © OpenStreetMap contributors

### How long are the loops?

Rio da Prata is about 34 km and Rio do Ouro about 27 km from Anitápolis. Cachoeira May is about 17 km and Rio Bravo about 16 km from Santa Rosa de Lima.

Sources: Climate of the last ten complete years from the NASA Langley Research Center POWER Project (monthly API), funded through the NASA Earth Science Division. Rain and snow days are estimates from monthly precipitation.; © OpenStreetMap contributors

### How many days do I need?

About four days lets you ride every loop and the link between the two towns.

Sources: Climate of the last ten complete years from the NASA Langley Research Center POWER Project (monthly API), funded through the NASA Earth Science Division. Rain and snow days are estimates from monthly precipitation.; © OpenStreetMap contributors

### Do I need a guide?

No. Download the tracklogs and plan the stages with the Acolhida na Colônia office. A guided trip is a choice.

Sources: Climate of the last ten complete years from the NASA Langley Research Center POWER Project (monthly API), funded through the NASA Earth Science Division. Rain and snow days are estimates from monthly precipitation.; © OpenStreetMap contributors

## Sources

- Climate of the last ten complete years from the NASA Langley Research Center POWER Project (monthly API), funded through the NASA Earth Science Division. Rain and snow days are estimates from monthly precipitation., checked 2026-11-02, https://power.larc.nasa.gov/docs/referencing/
- © OpenStreetMap contributors, checked 2026-11-14, https://opendatacommons.org/licenses/odbl/1-0/

Each fact on the page shows when it was last checked: https://www.outdoorgrid.ai/ride/santa-rosa-de-lima/gravel
